Explore this wastewater treatment project showcasing our solutions
Our septic specialists recently completed one of the most challenging wastewater system installations our team has ever undertaken. Rowan and Mal were called out to a new build in Tamborine Mountain. This build presented a unique logistical hurdle: the house had been fully built before the wastewater system was installed.
With the structure already in place, we were left with a narrow 1.8 metre corridor down the side of the house. This space had to accommodate a 3- tonne excavator, the wastewater tank and multiple loads of gravel for the back of the property.
Installing this wastewater treatment system is such a confined space that requires careful planning and coordination. Our team managed to get a smaller 3-tonne excavator down the side of the house and used a 50-tonne crane to lift and install the wastewater tank over the house. Even though this job was tricky, we ended up safely ensuring the new wastewater system was installed at a pre-excavated site. This project went exactly to plan with no damage.
Whether you are building on a steep slope or have limited access on a suburban block, our team specialises in difficult installations across the Mount Tamborine and the Gold Coast.